This past week, the MTA held and released info from its latest board meeting. And there's a very interesting tidbit on the 61st page.
Notice anything Second Avenue Subwaysey about it? With this, the TA has jumped into the pressure cooker, shut the lid and cranked it up beyond 400 degrees (If pressure cookers actually use temperatures, we don't know or care to check atm.)
If this thing doesn't open by December, maaannnnnnnn.
Credit for picture goes to http://www.amny.com/transit/second-avenue-line-w-train-depicted-in-new-mta-subway-map-1.11847457
